Project Description
A Landmark Building in the centre of Oxford.
Design and Installation of the ductwork for this prestigious 15000 sq. ft. Building.
This was a Fast Track Contract which included the total Strip out and renewal of all the Ventilation Systems over 3 floors.
Installation of Daikin void mounted heat recovery units, ductwork and grilles ensuring fresh air to the workplace environment.